LDPE material, thickness from 0.04-0.50 mm. Available in clear, opaque white, and black colors.
For laying the floor before pouring cement To prevent water leakage both before and after pouring the cement. Prevents salt deposits on cement floors. This is because the brackish water beneath the floor has seeped up. Can be used to maintain the temperature of the cement after it has been poured. In order to keep the heat